Past Event

Technical Visit Flood Mitigation Project at IOI Puchong Triple Cell Pipe Jacking Crossing LDP Highway Using Slurry Method
Venue: IOI PUCHONG, Jalan Merah 1 Bandar Puchong Jaya
Date & Time: 04 Dec 2024 (8:30 AM - 1:00 PM) Closed
CPD: 3
Closing Date Before: 01-Dec-2024 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

To mitigate the frequent flooding near KM 21.6 of Lebuhraya Damansara Puchong {LDP},  Majlis Bandaraya Subang Jaya[MBSJ] together with IOI Properties Group Sdn Bhd  [IOI] and Lingkaran Transkota Sdn Bhd [LITRAK]  have implemented a flood mitigation project by upgrading the drainage system in the vicinity  to divert the flash food rain water from upstream to downstream of the catchment

The project scope include installation of 114m length of  of3.6 mx2.85m and 90m length 3.6 mx3m box culvert parallel to LDP highway by cut and cover method and installation of a triple 1.5m reinforce pipe culvert by pipe jacking method across the LDP highway at KM 21.5 The project duration is 8 months and currently is 60% completion and target to complete tentatively in February 2025.

The technical visit will highlight the technical issues encountered and the remedial measures taken to overcome the obstacles and alternative design adopted in implementation of the project.


NOTE:

-  SAFETY REMINDER : Participants shall be well-equipped with their own PPE equipment, i.e. safety helmet, safety vest and safety boots in order to be allowed access into the site.
-  Transport : Strictly by Transportation Provided (please arrive before transport depart from Wisma IEM)
-  The visit is strictly limited to 10 participants registered on a first-come, first-served basis or once
   the visit reaches its limit number of participants. No additional participants or late registration
   shall be entertained.


Additional Information
Posted on
 
 
Technical Visit Flood Mitigation Project at IOI Puchong Triple Cell Pipe Jacking Crossing LDP Highway Using Slurry Method
Flyer

13-Nov-2024
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 46.30 46.30
HONORARY FELLOW 46.30 46.30
FELLOW 46.30 46.30
DISTINGUISHED MEMBER 46.30 46.30
SENIOR MEMBER 46.30 46.30
MEMBER 46.30 46.30
HONORARY MEMBER 46.30 46.30
SENIOR GRADUATE 46.30 46.30
GRADUATE 46.30 46.30
INCORPORATED MEMBER 46.30 46.30
AFFILIATE 46.30 46.30
ASSOCIATE MEMBER 46.30 46.30
ENGINEERING TECHNOLOGIST GRADUATE 46.30 46.30
ENGINEERING TECHNICIAN GRADUATE 46.30 46.30
ENGINEERING TECHNOLOGIST MEMBER 46.30 46.30
ENGINEERING TECHNICIAN MEMBER 46.30 46.30
STUDENT 46.30 46.30
Non IEM Member 64.81 64.81

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us