Download Details


Details of Technical Visit Flood Mitigation Project at IOI Puchong Triple Cell Pipe Jacking Crossing LDP Highway Using Slurry Method
Updated on: 13-Nov-2024
Title: Technical Visit Flood Mitigation Project at IOI Puchong Triple Cell Pipe Jacking Crossing LDP Highway Using Slurry Method
Description: Flyer
Download Details:
Download Link: Download
File Size 673K
Total Downloads: 78

Comment

is that possible if we meet up at site without depart from IEM since my house nearer to the IOI Puchong?

From MS. NOR AZRA BTE AB WAHAB
on 11-Nov-2024 10:23:02 AM

is that possible if we meet up at site without depart from IEM since my house nearer to the IOI Puchong?

From MS. NOR AZRA BTE AB WAHAB
on 11-Nov-2024 09:55:01 AM

Page 1 of 1 (2 items)
Prev
[1]
Next

Comment Area

Please login to add your comment, click here to login
 

Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us