Failure Investigation of a Geosynthetic-Reinforced Soil Slope Subjected to Heavy Rainfall Report by Dr Ng Soon Min
|
06-Apr-2022
|
Download
|
Post Comment
|
Webinar on Diaphragm Wall and Secant Bored Pile Wall Construction Challenges for Underground MRT Stations and Shafts Report by Ir. Allan Chwee
|
20-Dec-2021
|
Download
|
Post Comment
|
Pre-30th GETD AGM Technical Talk on Advancements of Realistic Simulation of Jet Grouting Piles (JGP) and Deep Cement Mixing (DCM) for Ground Improvement Application Report by Dr Ng Soon Min
|
29-May-2020
|
Download
|
Post Comment
|
One Day Short Course on Practical Application of FEM in Geotechnical Engineering Report by Dr Ng Soon Min
|
29-May-2020
|
Download
|
Post Comment
|
One Day Seminar on Geotechnical Engineering Report by Dr Ng Soon Min
|
29-May-2020
|
Download
|
Post Comment
|
Talk on “Insights from Reliability-Based Design to Complement Eurocode 7 Design Approach” by the Recipient of the 2019 Thomas A. Middlebrooks Award from ASCE Report by Ir. Dr Gue Chang Shin
|
29-Nov-2019
|
Download
|
Post Comment
|
Technical Talk on “Geotechnical Engineering Analysis and Design – A Personal Journey, Presented Report by Ir. Dr Ooi Lean Hock “ by Dr Boon Chia Weng
|
20-Dec-2018
|
Download
|
Post Comment
|
Evening Talk on Redevelopment of Monuments: Challenges and Solutions with Innovation Idea Report by Dr Boon Chia Weng
|
20-Dec-2018
|
Download
|
Post Comment
|
One Day Short Course on FEM in Geotechnical Engineering Report by Ir. Dr Gue Chang Shin
|
23-Nov-2018
|
Download
|
Post Comment
|
Evening Talk on The Gold Line Metro, Doha, Qatar Report by Dr Boon Chia Weng
|
26-Jun-2018
|
Download
|
Post Comment
|
Technical Visit to Sub-Structure of Hotel, Retail Podium and Associated Works for the Proposed Lot 185, 167 & 176 Mixed Development at Persiaran KLCC, Kuala Lumpur City Centre Report by Mr. Loh Wooi Chuan
|
21-May-2018
|
Download
|
Post Comment
|
Technical Visit to Technical Visit to MRT 2 Site – Sentul West Station, Kuala Lumpur Report by Mr. Loh Wooi Chuan
|
26-Apr-2018
|
Download
|
Post Comment
|
Technical Visit to Sunway Pre-stressed Spun Pile Factory Report by Ir. Lee Peir Tien
|
26-Apr-2018
|
Download
|
Post Comment
|
Evening Talk on Behavior and Stability of Cut Slopes with Special Reference to Malaysia Report by Ir. Lee Peir Tien
|
26-Apr-2018
|
Download
|
Post Comment
|
Finite Element Analysis of Deep Excavation Problems Report by Ir. Mak Wai Kin
|
15-Aug-2017
|
Download
|
Post Comment
|
Technical Visit to Warisan Merdeka (New Landmark for the Nation), Kuala Lumpur Report by Mr. Loh Wooi Chuan
|
30-May-2017
|
Download
|
Post Comment
|
Talk on “The Need to Satisfy Mechanistic Fundamentals for Valid Forensic Engineering Findings” Report by Ir. Kenny Yee
|
16-Dec-2016
|
Download
|
Post Comment
|
Evening Talk on “Insurance in the Construction Industry” Report by Ir. Lee Peir Tien
|
16-Dec-2016
|
Download
|
Post Comment
|
Evening Talk on Embankment Deformations include Creep in Compression and Shear Report by Ir. Yee Thien Seng
|
16-Dec-2016
|
Download
|
Post Comment
|
Reprise of the 56th Rankine Lecture “Geotechnics and Energy” Report by Ir. Dr Gue Chang Shin
|
30-Nov-2016
|
Download
|
Post Comment
|
Technical Talk on Ground Improvement Techniques for Reclamation Report by Ir. EG Balakrishnan
|
24-Oct-2016
|
Download
|
Post Comment
|
Technical Talk on The role of Geosynthetics in Improving the Performance of Structures Built over Soft Soils Report by Mr. Richard Ong Tian Hwa
|
24-Oct-2016
|
Download
|
Post Comment
|
Seminar on Jack-in Piles – Good Practices and its Applications Report by Ir. Lee Peir Tien
|
24-Oct-2016
|
Download
|
Post Comment
|
Evening Talk on Considerations of Deep Excavation in Kenny Hill and Kuala Lumpur Limestone Formations Report by Ir. Lee Peir Tien
|
24-Oct-2016
|
Download
|
Post Comment
|
Two Days Seminar on Advancement in Ground Investigation and Geotechnical Instrumentation Reported by Ir. Lee Peir Tien
|
26-Sep-2016
|
Download
|
Post Comment
|
Talk on “Site Supervision of Installation of Bored Piles” Reported by Ir. Liew Shaw Shong
|
26-Sep-2016
|
Download
|
Post Comment
|
One Day Course on Design and Construction of Modern Concrete Face Rockfill Dam (CFRD) Report by Mr. Steven Toh Chin Kok, Grad. IEM
|
10-Aug-2016
|
Download
|
Post Comment
|
Talk on “Landslide Debris and Baffles” Report by Dr Ooi Teik Aun, Hon FIEM
|
01-Aug-2016
|
Download
|
Post Comment
|
Technical Visit to Pre-stressed Spun Pile Factory, Nilai Report by Ir. Lee Peir Tien
|
23-Jun-2016
|
Download
|
Post Comment
|
Recent Development in the Vacuum Preloading Method and Its Application for Soft Soil Improvement Report by Ir. Sin Peng Tean
|
23-Jun-2016
|
Download
|
Post Comment
|
Design and Construction Considerations for Steel Struts in Excavation of KVMRT Project in Malaysia Report by Ir. Lee Peir Tien
|
23-Jun-2016
|
Download
|
Post Comment
|
Seminar on Deep Excavation Report by Ir. Lee Peir Tien
|
23-Jun-2016
|
Download
|
Post Comment
|
Numerical Modelling and Computation Methods of Concrete Face Rockfill Dam Report by Mr. Steven Toh Chin Kok, Grad. IEM
|
23-Jun-2016
|
Download
|
Post Comment
|
Evening Talk on Submarine Landslide Flows Simulation Through Centrifuge Modelling Report by Ir. Jack Pan
|
10-Feb-2016
|
Download
|
Post Comment
|
Evening talk on “Overcoming the design and construction for the Crossrail Canary Wharf Station” Report by Ir. Yee Thien Seng
|
10-Feb-2016
|
Download
|
Post Comment
|
Talk on “Coupled Fluid-Particle Modelling of Debris Flow” Report by Dr Gue Chang Shin
|
10-Feb-2016
|
Download
|
Post Comment
|
Myths and Common Problems Discovered in Geotechnical Forensic Engineering Report by Ir. EG Balakrishnan
|
27-Jan-2016
|
Download
|
Post Comment
|
Technical Visit to Foundation and Basement Construction of IKEA+MYTOWN, Jalan Cochrane, Kuala Lumpur Report by Ir. Lee Peir Tien
|
27-Jan-2016
|
Download
|
Post Comment
|
Technical Visit to Melawati Business Complex, Taman Melawati Report by Ir. Lee Peir Tien
|
27-Jan-2016
|
Download
|
Post Comment
|
Landfill Engineering: Waste/Barrier Interaction Report by Mr. Richard Ong Tian Hwa, Grad. IEM
|
22-Apr-2016
|
Download
|
Post Comment
|
Failures of Geotechnical Works in Coastal Soft Ground Report by Ir. Lee Peir Tien
|
27-Jan-2016
|
Download
|
Post Comment
|
Bukit Bintang MRT Station, Kuala Lumpur Report by Ir. Jack Pan
|
27-Jan-2016
|
Download
|
Post Comment
|
Design & Construction of Pile Foundations Report by Ir. Yee Yew Weng & Ir. Dr Chan Swee Huat
|
03-Nov-2015
|
Download
|
Post Comment
|
2-Day Short Course on “The Essentials of Soil Behaviour for Modern Geotechnical Engineering Practice by Professor Jim Graham Report by Ir. Yee Thien Seng
|
03-Nov-2015
|
Download
|
Post Comment
|
Vacuum Consolidation Method in Vietnam Report by Ir. Yee Yew Weng & Ir. Dr Chan Swee Huat
|
03-Nov-2015
|
Download
|
Post Comment
|
Geotechnical Considerations for Deep Excavation and Tunneling Report by Ir. Lee Peir Tien
|
27-Jan-2016
|
Download
|
Post Comment
|
Design and Construction of Excavation Works: Cochrane Station, Kuala Lumpur Workshop on “Soil Parameters - Interpretation for Design” Report by Mr. Richard Ong Tian Hwa, Grad. IEM
|
22-Apr-2016
|
Download
|
Post Comment
|
Reinforced Soil Retaining Walls: An Outline of Design Methods and Sources of Conservatism Workshop on “Soil Parameters - Interpretation for Design” Report by Mr. Richard Ong Tian Hwa, Grad. IEM
|
22-Apr-2016
|
Download
|
Post Comment
|
Workshop on “Soil Parameters - Interpretation for Design” Report by Mr. Richard Ong Tian Hwa, Grad. IEM
|
22-Apr-2016
|
Download
|
Post Comment
|
Evening Talk on Piled Raft Design for Five Storey Apartment on Klang Clay Report by Ir. Lee Peir Tien
|
13-Jul-2015
|
Download
|
Post Comment
|
Artificial Ground Freezing for Underground Construction Report by Mr. Christian Sanyas
|
13-Jul-2015
|
Download
|
Post Comment
|
Talk on “Dynamic Testing - Is it a good idea, or not?" Report by Ir. Liew Shaw Shong
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on “Challenges Related To Offshore Foundations – NGI Experience” Report by Dr. Gue Chang Shin
|
22-Apr-2016
|
Download
|
Post Comment
|
IEM One-Day Short Course On Basics of Design of Pile Foundation Report by Ir. Liew Shaw Shong
|
30-Jun-2015
|
Download
|
Post Comment
|
CIE-HKIE-IEM Tripartite Seminar on The Management and Case Study on Adjacent Underground Construction Report by Ir. Liew Shaw Shong
|
30-Jun-2015
|
Download
|
Post Comment
|
Application of EPS in Civil Engineering Report by Ir. EG Balakrishnan
|
22-Apr-2016
|
Download
|
Post Comment
|
Think Beyond Standard Code of Practice Rules - Mobilizable Strength Design Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Workshop titled Advance Topics in Pile Foundation Design Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Evening talk titled Applications of Centrifuge Modeling for the Study of Soft Soil Problems Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Evening talk entitled Ground treatment for double railway track in Northern part of Peninsular Malaysia Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Half-Day Seminar entitled Excavation Design, Case Histories and Geotechnical Safety in Relation to Water Pressures Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk titled Assessment of defect properties and its application in rock engineering Report by Ir. Yee Thien Seng
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on Seismic Hazard Assessment Considering Geotechnical Conditions for Earthquake Resistant Design of Structures in Malaysia Report by Ir. Lee Eng Choy
|
30-Jun-2015
|
Download
|
Post Comment
|
Half-Day Seminar on Engineering Aspects of Lessons Learned and Beyond Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
One Day International Seminar on Engineering a Sustainable Development: Role played by Geotechnical Engineering Report by Ir. Chua Chai Guan
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on Dynamic Analysis of Open-Ended Pipe Piles Report by Ir. Liew Shaw Shong
|
30-Jun-2015
|
Download
|
Post Comment
|
Technical Talk on General Background to Explosive Compaction Report by Mr. Chow Chee Meng, MIEM
|
22-Apr-2016
|
Download
|
Post Comment
|
Technical Visit to New LCCT Earthworks Package at KL International Airport Report by Ir. Lee Eng Choy
|
30-Jun-2015
|
Download
|
Post Comment
|
Open Forum on Dynamic Pile Testing Report by Ir. Liew Shaw Shong
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on The Role of a Geotechnical Instrumentation Monitoring Program in Averting a River Exclusion Cofferdam¡¯s Possible Disintegration Report by Ir. Chua Chai Guan
|
22-Apr-2016
|
Download
|
Post Comment
|
Talk on Landslide Hazard & Risk Assessment Report by Ir. Oh Chin Wah
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on Experience Sharing on the Current Geotechnical Practice in Hong Kong Report by Ir. Chow Chee Meng
|
30-Jun-2015
|
Download
|
Post Comment
|
Talk on Distributed Optical Fibre Strain Sensing in Piles and Retaining Walls Report by Ir. Dr Chan Swee Huat
|
30-Jun-2015
|
Download
|
Post Comment
|