Technical Visit Flood Mitigation Project at IOI Puchong Triple Cell Pipe Jacking Crossing LDP Highway Using Slurry Method (IOI PUCHONG, Jalan Merah 1 Bandar Puchong Jaya)
By Technical Division - Tunneling and Underground Space Engineering (TUSTD)
Closed
04 Dec 2024 (08:30:00 AM - 13:00:00 PM) (CPD: 3)
|
|
|
|