SYNOPSIS
This course consist lectures, workshops, and presentations on important MyCESMM2 matters in the following manners:
Lectures
• Standard Method of Measurement (SMM) in relation to preparation of Bill of Quantities (BQ), function of BQ, why standardised BQ is needed, SMM in construction procurement without SMM, benefits of standardizing the BQ for civil engineering works using MyCESMM • Introduction to CESMM (2003), MyCESMM (2011), the newly revised MyCESMM2 (2018) and the new MS2701:2018 • Principles of MyCESMM2; Definitions, general principle, application of the work classifications, coding & numbering of items, preparation of BQ, completion, pricing and use of BQ, and finally method-related charges • Introduction to selected work classes; General Items, Roads & Pavings and Earthworks • For detail items, to cover work classifications of Piling, Concrete, Piling and Drainage works
Workshops • Prepare BQ description by extraction from Library of Standard BQ description for MyCESMM2 • Taking off, Abstracting and prepare BQ in-line with MyCESMM2
BIODATA OF SPEAKER
Ir. Hj. Shahul Ikram bin Hj. Adnan BSCE, MBA PEng MIEM holds a Bachelor of Science in Civil Engineering from University of Nebraska, USA and an MBA (Construction Business) from International Islamic University (UIA), Malaysia. He runs a civil and structural engineering consultancy as a director for Railplan Consultants Sdn. Bhd. based in Kajang. He is also a CIDB’s certified MSCESMM2 Trainer.
- All participants are required to bring a notebook to operate MS EXCEL
|