Pre-Recorded Webinar Talk on "Flood Risk Management and Early Warning Systems" - [in conjunction with World Engineering Day Celebration from 4th March till 9th March 2024]
Venue:
|
Digital Platform
|
Date & Time:
|
06 Mar 2024 (11:01 AM - 1:00 PM)
Closed
|
CPD: |
2 |
Closing Date Before: |
03-Mar-2024 (Subject to change based on availability of seat) |
Organised By |
Technical Division - Environmental Engineering (ENETD) |
SYNOPSIS
Global flood risk is increasing due to factors such as climate change and population growth, making floods a major threat to communities and infrastructure worldwide. Floods can cause significant damage to property, disrupt transportation and communication networks, and result in loss of life and economic productivity. To combat disaster risk reduction of various disasters, including floods, the World Meteorological Organization has launched the Early Warnings for All initiative. This technical talk will cover various aspects of flood risk management, including: flood risk assessment based on continuous hydrological monitoring; selection of suitable hydrological instruments for continuous monitoring; proper monitoring site selection; equipment installation and maintenance; implementation of early warning systems; and real-time data transfer, management, and data distribution. The talk will also include real-world case studies of successful projects implemented in multiple countries, providing participants with valuable insights into flood risk management practices. Additionally, the talk will discuss the importance of early warning systems in mitigating the impacts of floods. The talk is expected to increase participants' awareness of flood management and enable them to make informed decisions in this field.
ABOUT SPEAKER
Mr. Niksa Orlic is a co-founder of Geolux, a Croatia-based company that specializes in the development of hydrological instrumentation with the emphasis on contactless water level and discharge monitoring. He holds a Masters degree in engineering and has 16 years of experience in the environmental monitoring industry. During the past 5 years, Mr. Orlic has been involved in the development and commissioning of several real-time flood monitoring projects across the globe, where he has contributed his technical know-how and has gained a reputation as a reliable expert in the field.
Limited to 870 participants only (first come basis) and confirmation email will be sent for successful registration latest by 05 March 2024 @ 5.00 PM
|
|