Webinar Talk on “Challenges of Bored Tunnels and Pipe Box Tunnel For Circle Line MRT Singapore”
Venue: Digital Platform
Date & Time: 24 Apr 2024 (4:00 PM - 6:00 PM) Closed
CPD: 2
Closing Date Before: 21-Apr-2024 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

Prince Edward Road Station (PES) and Tunnels for Circle Line 6 (C885) is a fully underground Mass Rapid Transit (MRT). The location of the MRT station and tunnels are in close proximity to historical temple, mosque, commercial buildings and road viaducts in the densely built-up Central Business District. The overview of the scopes, construction method and challenges will be discussed. This presentation will focus on the tunnelling works including the bored tunnelling works running beneath the former Tanjong Pagar Railway Stations (TPRS) – a gazetted National Monument and construction of underpass below a heavily trafficked road using a trenchless method.

For the bored tunnelling works underneath the TPRS, extensive of additional foundation and geological investigation were carried out. The performance of the tunnelling works, instrumentation monitoring and additional mitigation measures that were implemented will be included. For the construction of the underpass, pipe roof method was selected due to the site conditions which prevented closure of road and the presence of utilities. The presentation will describe the basic design of the Pipe Roof excavation, while detailing the process of selected horizontal jet grouting method. Upon commencement of excavation, the quality of the grouted soil was able to be seen.  The difficulties of using horizontal grouting for such excavation and the possible solutions will be discussed with the performance of the excavation using installed soil instruments.


BIODATA OF SPEAKER

Mr. Pan How Yen

Associate of WSP – Transport and Infrastructure, a highly accomplished engineer with more than 12 years of experience in deep excavation, earth retaining and stabilising system (ERSS) and tunnelling works in Singapore.  Pan How Yen graduated with a master’s degree, major in geotechnical engineering from Universiti Teknologi Malaysia.

How Yen has been mainly engaged in the ERSS design and construction of Prince Edward Road Station and Tunnels for Circle Line 6 (C885), one of the awarded the Tunnelling and Underground Construction Society (Singapore) Project of the Year Finalist 2022. Other major projects include the Construction of Polder Dike at Tekong Area A and C, Sentosa Gateway Tunnel (ER296) and The Arc (NTU – Learning Hub). How Yen is also familiar with the local design guideline and authorities’ requirement in Singapore.


Limited to 870 participants only (first come basis) and confirmation email will be sent for successful registration latest by 23 April 2024 @ 5.00 PM


Additional Information
Posted on
 
 
Webinar Talk on “Challenges of Bored Tunnels and Pipe Box Tunnel For Circle Line MRT Singapore”
Flyer

01-Apr-2024
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.52 13.89
HONORARY FELLOW 18.52 13.89
FELLOW 18.52 13.89
DISTINGUISHED MEMBER 18.52 13.89
SENIOR MEMBER 18.52 13.89
MEMBER 18.52 13.89
HONORARY MEMBER 18.52 13.89
SENIOR GRADUATE 18.52 13.89
GRADUATE 18.52 13.89
INCORPORATED MEMBER 18.52 13.89
AFFILIATE 18.52 13.89
ASSOCIATE MEMBER 18.52 13.89
ENGINEERING TECHNOLOGIST GRADUATE 18.52 13.89
ENGINEERING TECHNICIAN GRADUATE 18.52 13.89
ENGINEERING TECHNOLOGIST MEMBER 18.52 13.89
ENGINEERING TECHNICIAN MEMBER 18.52 13.89
Non IEM Member 46.29 46.29

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us