WEBINAR - IEM Fire Advisory Board Dialogue: Testing and Commissioning Guideline for Fire Protection Systems
Venue:
|
Digital Platform
|
Date & Time:
|
02 Feb 2021 (2:00 PM - 4:00 PM)
Closed
|
CPD: |
2 |
Closing Date Before: |
30-Jan-2021 (Subject to change based on availability of seat) |
Organised By |
Fire Advisory Board (FAB) |
SYNOPSIS
The Fire Advisory Board of IEM has drafted a Testing and Commissioning (T&C) Guideline for Fire Protection Systems to address the gaps and needs of a documented guideline on T&C requirements for consistent and systematic execution of fire protection system T&C activities. The dialogue session will present an outline of the T&C guideline to introduce to members of its objectives, definitions, systematic T&C process activities and applications of the guideline. The dialogue session is also intended to gather feedback from members for suggestions on implementation, and any shortcoming or improvement needed before finalization prior to publication.
The objectives of this T&C guideline are to:
- To establish a fire protection and life safety system testing and commissioning process that provides proper documentation with traceable records; - To provide guidance for systematic execution and coordination of testing and commissioning process and activities; - To ensure that all T&C procedures and records are properly documented such that they can be used for future reference for maintenance purposes.
Panelist:
Ir. Yim Hon Wa Chairman of Fire Advisory Board
Ir. Leong Siew Meng Deputy Chairman of WG Guideline
Moderator: Ir. Wong See Foong Advisor of Fire Advisory Board
Limited to 470 participants only (first come basis) and confirmation email will be sent for successful registration latest by 01 February 2021 @ 5.00 PM
|
|