Event Registration

Technical Visit to Selinsing Gold Mine Manager Sdn Bhd
Venue: Selinsing Gold Mines Manager Sdn Bhd, Lot 157 Jalan Bukit Bius, P.O Box 18, 27200 Kuala Lipis, Pahang
Date & Time: 22 Jun 2024 (7:15 AM - 2:30 PM)
CPD: 4
Closing Date Before: 19-Jun-2024 (Subject to change based on availability of seat)
Organised By Technical Division - Oil, Gas and Mining

BACKGROUND

The Selinsing Gold Mine is located at Bukit Selinsing near Sungai Koyan, approximately 65km north of Raub and 30km west of Kuala Lipis. A trip to Selinsing from Kuala Lumpur may take between 2 to 3 hours depending on traffic and weather condition.

Selinsing has a long mining history. Mining commenced prior to 1888 and has operated intermittently through to 1966. Underground and open cut mining, together with tailings treatment has produced an estimated 85,000 ounces of gold during this period. Fast forward to present day between 2003 and 2005, treatment of the tailings using heap leach extraction produced 6,624 ounces. In October 2008, a new gold treatment plant was built resulting in the first gold poured from the gravity circuit 12 months later. July 2009 saw open pit mining started at the location and began hauling ore material to the ROM pad for production and by February 2010 the projects’ own carbon-in-leach (CIL) circuit commenced commissioning.

The Selinsing deposit occurs along the north striking Raub, Bentong Suture, and a major tectonic feature that runs through peninsular Malaysia. The deposit is hosted by a series of auriferous quartz veins and stockworks of quartz veinlets in a package of sheared calcareous epiclastic sediments. Gold mineralization at Selinsing is associated with high grade quartz veining and associated sericitization and silification within a major shear zone.

The Selinsing gold mine project contains a resource comprised of an indicated mineral resource of 4.82 million tonnes at 1.49 gpt Au, using a cut-off of 0.59 gpt Au for contained ounces of 231,000 ounces of gold, and an inferred mineral resource of 10.32 million tonnes at a grade of 1.17 gpt Au for contained ounces of 388,000 ounces f gold at similar cut-off grade. The resource is a near surface, open pitable deposit containing gold bearing material amenable to CIL treatment, with comprehensive metallurgical test work showing 92% to 95% recovery by CIL.


NOTE
- The visit is strictly limited to only 30 participants registered and registration will be on a
    first-come, first-served basis.  
-  Assemble at Bangunan Ingenieur by 7.15 am. Coach will depart at 7.30 am sharp  


SAFETY NOTICE
-  Participants are encouraged to wear casual clothing for the visit and are advised to bring their
   own personal protective equipment (PPE) if available, including safety vest, hard hat and safety
   shoes.


Additional Information
Posted on
 
 
Technical Visit to Selinsing Gold Mine Manager Sdn Bhd
Flyer

02-May-2024
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 46.30 46.30
HONORARY FELLOW 46.30 46.30
FELLOW 46.30 46.30
DISTINGUISHED MEMBER 46.30 46.30
SENIOR MEMBER 46.30 46.30
MEMBER 46.30 46.30
HONORARY MEMBER 46.30 46.30
SENIOR GRADUATE 46.30 46.30
GRADUATE 46.30 46.30
INCORPORATED MEMBER 46.30 46.30
AFFILIATE 46.30 46.30
ASSOCIATE MEMBER 46.30 46.30
ENGINEERING TECHNOLOGIST GRADUATE 46.30 46.30
ENGINEERING TECHNICIAN GRADUATE 46.30 46.30
ENGINEERING TECHNOLOGIST MEMBER 46.30 46.30
ENGINEERING TECHNICIAN MEMBER 46.30 46.30
STUDENT 46.30 46.30
Non IEM Member 64.81 64.81

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST

Non IEM member registration


Name:
Company Name:
Address:
Designation:
Contact No:
Office No:
Fax No:
Email:



Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us